Completed Assignments Fall 2008
Team |
Meeting Minutes 1 |
Proposals |
MM 2 |
Teach-In |
MM 3 |
MM 4 |
|
---|---|---|---|---|---|---|---|
AutoCAD |
|
||||||
Automated Chemical Doser |
|
|
|||||
Linear Orifice Flow Meter |
|
|
|||||
CFD Flocculation Modeling |
|
|
|||||
CFD Sedimentation Modeling |
|
|
|||||
Design |
|
||||||
Floating Flocs |
|
|
|
||||
FCM Chlorine Precipitation |
|
|
|||||
FCM Linearization and Calibration |
|
||||||
Outreach |
|||||||
Pilot Plant Tapered Flocculation |
|
||||||
Pilot Plant Sedimentation |
Teach-In |
||||||
Plate Settler Spacing |
|