Pilot Plant Tube Flocculator Meeting Minutes

Fall 2008 Minutes

September 25, 2008

Accomplishments

  • Attempted to run tube flocculator by siphoning water out with a vacuum pump
  • Met with Alissa to discuss wiki organization
  • Met with Ian to discuss tube flocculator configuration and method to measure turbidity/ settling velocity after flocculation
  • Worked on teach- in presentation and wiki page

Outcomes

  • After discussion with Ian, team will possibly use FReTA at the WFP

Issues

  • not enough pressure from vacuum pump to run tube flocculator
  • soft tubing pinches
  • air bubbles stuck in tube flocculator, possibly gassing out from raw water
  • pilot plant system cannot be run until sed tanks are sealed or blocked off
  • No labels