Completed Assignments Fall 2008
Team |
Meeting Minutes 1 |
Proposals |
MM 2 |
Teach-In |
MM 3 |
---|---|---|---|---|---|
AutoCAD |
|
|
|||
Automated Chemical Doser |
|
|
|||
Linear Orifice Flow Meter |
|
|
|||
CFD Flocculation |
|
|
|
||
CFD Sedimentation |
|
|
|
||
Design |
|
|
|||
Floating Flocs |
|
|
|||
FCM Chlorine Precipitation |
|
|
|||
FCM Linearization and Calibration |
|
|
|||
Outreach |
|
|
|||
Pilot Plant Tapered Flocculation |
|
|
|||
Pilot Plant Sedimentation |
|
|
|||
Plate Settler Spacing |
|
|
|||
Sedimentation Tank Modeling |
|