Accomplishments

  • Set up system for collecting data (with pump and turbidimeter) and gathered some data for turbidity during floc blanket formation in the 2nd sed tank.

Outcomes

  • We're ready to collect data!
  • Julia saw well formed floc blankets in both of the sedimentation tanks before they were destroyed.

Issues

  • Floc blanket wasn't well-formed yet.
  • We only have one turbidimeter, so we can only be testing one of the sedimentation tanks at a time. That isn't too big of an issue; however it just means that overnight data collection cannot happen simutaneously.
  • When the flow into the system is blocked and then cleared, the sludge blanket is destroyed because the upflow velocity increases far too rapidly.