Pilot Plant Sedimentation Tank Meeting Minutes

Fall 2008 Minutes

October 27, 2008

Accomplishments

  • Set up system for collecting data (with pump and turbidimeter) and gathered some data for turbidity during floc blanket formation in the 2nd sed tank.

Outcomes

  • We're ready to collect data!
  • Julia saw well formed floc blankets in both of the sedimentation tanks before they were destroyed.

Issues

  • Floc blanket is no longer well-formed.
  • When the flow into the system is blocked and then cleared, the sludge blanket is destroyed because the upflow velocity increases far too rapidly.
  • No labels