You are viewing an old version of this page. View the current version.
Compare with Current
View Page History
Version 1
Next »
accomplishments
- met with Monroe briefly to determine set up of tube flocculator
- ran uniform baffle configuration
- determined relationship between PAC dose and alum dose
- ran tapered baffle configuration
- organized pilot plant supplies
- attempted to set up tube flocculator with t to let out air pressure
- used peristaltic pump from sed tank to push water through tube settler
Issues
- air in tube settler issue with gravity and pump
- entering from connection?
Outcome
- need to play around more with tube settler.
- floc profile for floc tank