You are viewing an old version of this page. View the current version.

Compare with Current View Page History

Version 1 Next »

accomplishments

  • met with Monroe briefly to determine set up of tube flocculator
  • ran uniform baffle configuration
  • determined relationship between PAC dose and alum dose
  • ran tapered baffle configuration
  • organized pilot plant supplies
  • attempted to set up tube flocculator with t to let out air pressure
  • used peristaltic pump from sed tank to push water through tube settler

Issues

  • air in tube settler issue with gravity and pump
  • entering from connection?

Outcome

  • need to play around more with tube settler.
  • floc profile for floc tank
  • No labels