Design Goals
Fall 2008 Team Members
Reiko Baugham
Sarah Schwetschenau
Cherish Scott
Tania Quesada
Fall 2008 Goals
- Overall Goal – continue to improve the automation of the design with built in checks for reasonable values ie. When can sed tank water depth be lowered from the 2m design.
-
- Whole Team to be divided as issues are encountered
-
- Aid Honduras Team with individual plant designs as they are presented to us
-
- Whole Team to be divided as issues are encountered
-
- Explore other methods of designing the sedimentation tank. Should b be set?
-
- Sara
-
- Adjust baffle placement in the flocculation tank for odd numbered baffles
-
- Tania
-
- Create design pages for sample tanks at different flow rates. For flow rates from 50 gal/min to 1200 gal/min in 100 gal/min increments. Pages will note what portions of the design aren't automated and recommend values.
-
- We will be working in pairs initially for these, but will split off for efficiency in 1 month.
- To be completed by Oct. 15
-
- Documenting Design Algorithms on the Wiki -
-
- Sara - Lamella, Sedimentation, Slopes, Exit Channel
- Tania - Math Functions, Pipe Database, Inlet Channel, Fluids Functions
- Cherish - User Inputs, Design Assumptions, Entrance Tank, Minor Loss Coefficients
- Reiko - FCM, Fluids Functions, Launder, Sludge Drain
-
(Note: bulleted points describe division of tasks)