11/7/08

Accomplishments

  • Added another turbidimeter to system and process control.
  • Added a rapid mix coil to insure complete mixing of alum and clay before flocculation.
  • Put flocculator vertical to facilitate removal of air bubbles.

Metrics

  • Discussed height-dependence of water tank on head loss equations.

Outcomes

  • Effluent turbidity meter functions properly.

Issues

  • Need to raise temperature-controlled water tank.
  • Operational challenges persist regarding unstable inffluent turbidity.
  • Floc production is not fully developed.