Design Meeting Minutes

Summer 2009 Minutes

7/3/2009

Accomplishments
  • Worked on midterm wiki report
  • Changed baffle function so that floc tanks draw faster

Floc Hopper Group

Accomplishments
  • Finished writing the MtoA code that will create the floc hopper for the plant.
  • Updated the wiki page to include pictures of the floc hopper and its dimensions. 
  • Updated files in the Final Design folder (floc hopper - new design, floc hopper - old design, and replaced a link in the Master Program to call our new floc hopper file)
Issues
  • Need to change the origin of our floc hopper in the code so that it will be placed correctly within the plant.
Goals for upcoming week
  • Will work on placing the floc hopper in the correct position in the plant, as well as testing the floc hopper with various plant sizes.

Floc Tank Group

Accomplishments
  • Number of baffles in the last channel is now even
Issues
  • Subtracting a single baffle seems to have added more channels for smaller plant flow rates than anticipated
  • The ports between the channels take up the entire height of the tank for certain flow rates
Goals for upcoming week
  • Compare and understand the effect of removing a single baffle in the last channel to the original design
  • Ensure that the baffle spacing is no smaller than the width of the ports
  • Draw slots to slide the baffles into

Exit Channel Group

Accomplishments
  • A summary of major work completed since last meeting based on last meeting's identified outcomes/issues
  •  
Issues
  • Difficult and unresolved issues
  • Plans for action
Goals for upcoming week

Materials List Group

Accomplishments
  • A summary of major work completed since last meeting based on last meeting's identified outcomes/issues
  •  
Issues
  • Difficult and unresolved issues
  • Plans for action
Goals for upcoming week