Design Team Meeting Minutes
Spring 2009 Minutes
April 3, 2009
Accomplishments
- Held a meeting with Monroe and the people in Honduras. It was a basic Q&A session and helped clear up a lot of things so we can proceed. (notes can be found on the Tasks page linked at the bottom)
Metrics
Outcomes
- Decided that ports between channels will be located at the top of the wall instead of the bottom
- Sludge drain dimensions will be constrained so that they must be able to cover a 3-4" pipe
Issues
- Chemical stock tanks need to be changed so that a volume and dimensions are given. This will give engineers the option of using barrels or building tanks.
- In order to determine baffle thickness the baffle area needs to be included
Any Overall Team Comments:
Continued division of tasks can be found here