Comment: Migrated to Confluence 4.0

...

  • Number of baffles in the last channel is now even
  • Designed prototype for flocculator drainage system that requires no valves and drew in AutoCAD
Issues
  • Subtracting a single baffle seems to have added more channels for smaller plant flow rates than anticipated
  • The ports between the channels take up the entire height of the tank for certain flow rates

...

  • Compare and understand the effect of removing a single baffle in the last channel to the original design
  • Ensure that the baffle spacing is no smaller than the width of the ports
  • Draw slots to slide the baffles into

...

  • Send drainage design to engineers in Honduras to review

Materials List Group

Accomplishments
  • A summary of major work completed since last meeting based on last meeting's identified outcomes/issues
  •  
Issues
  • Difficult and unresolved issues
  • Plans for action
Goals for upcoming week

Materials List Group

Accomplishments
  • A summary of major work completed since last meeting based on last meeting's identified outcomes/issues
  •  
Issues
  • Difficult and unresolved issues
  • Plans for action

...

  • Worked on editing/improving wiki page for Final Midterm report
  • Added more calculations to MathCAD file including weir pipes, sed plate frame, and chimneys
  • Updated wiki page with all calculations
  • Created Input and Output tabs on Variable Naming Guide for the Materials List and loaded file to the wiki
Issues
  • Figuring out the most efficient and helpful way to organize our data and calculations
  • Had trouble understanding drop chimney dimensions - Demonstration at team meeting was helpful
Goals for upcoming week
  • Finalize materials
  • Price components