Accomplishments
- Added another turbidimeter to system and process control.
- Added a rapid mix coil to insure complete mixing of alum and clay before flocculation.
- Put flocculator vertical to facilitate removal of air bubbles.
Metrics
- Discussed height-dependence of water tank on head loss equations.
Outcomes
- Effluent turbidity meter functions properly.
Issues
- Need to raise temperature-controlled water tank.
- Operational challenges persist regarding unstable inffluent turbidity.
- Floc production is not fully developed.