Date

Attendees

  • Sara, Tobi, Camille, Kelee, Jim, Gabriel, Matt, Nick

Agenda

  1. New and notable
    1. VR options
      1. Oculus Rift
      2. Google Cardboard
    2. Measure the Future (potential Suma replacement)
  2. Review Assigned Action List from December 2015 meeting
    1. Matt on Elevators
      1. Quote from shops for electrical receptacles outside elevators
      2. one duplex receptacle to the left of both elevators
        1. $1500 for floors 1 and 2
        2. $500 for floor 3
      3. estimate from Schindler for receptacle in the elevators is $1100 per car
      4. team votes to go with Schindler; Sara will review budget
    2. Camille brought our request to up LibCal seats to 45 to PTAC
      1. not certain if the license has been updated yet
        1. it has not been updated from what we can tell by signing into the admin
      2. original license/subscription was set to expire 1/19/16
    3. Digital signage for reservable study rooms?
      1. should we revisit our plans?
      2. do we need a display per room?
      3. what usage do for current iPads outside Interview and OBS?
        1. Nick will pull referrer data from Google Analytics
      4. hardware options
        1. lease iPads
        2. buy android tablets
  3. Mobile Making Kit
    1. sponsored by MakerSpace Taskforce
    2. if approved, we would get this going early spring semester
    3. mobile cart
    4. Submitting an IMLS grant for the fall
      1. submit in Feb; hear back in August
  4. Nick: digitalsignage.com releases StudioLite 1.5 with source code on GitHub

Action items

  • Tobi Hines: Circ stat data for graduate study rooms
  • user-b028b: Retrieve stats on usage of on-location iPads for reserving Interview room and One Button Studio
    No historical data on outbound links (wasn't tracked in Google Analytics)
    Moving to new analytics system (Piwik) - Chris created site for signage.mannlib on 2/13/16 but no JS tracking yet so still no outbound links
    Nick is working with Chris to get JS tracking in place so we can log outbound links 
  • user-cc7e8: Follow up with PTAC on status of LibCal license
  • user-b509a: Review budget and verify we can cover costs for electrical receptacle installation and iPad mount by Schindler in each elevator car