Finishing Floculation Tanks, Taken May 6
|
Table for Chlorine Stock Barrels and Exit Tank, Taken May 6
|
|
|
|
Plastering Outside Walls, April 29
|
Sedimentation Tank, With Bands for Supporting Lamella Modules, Taken April 29
|
Finishing Bodega Floor, Taken April 29
|
|
|
|
Taken April 29
|
Chemical Stock Barrel Tables, Taken March 29
|
Taken April 26
|
|
|
|
Taken April 26
|
Taken April 7
|
Taken April 1
|
|
|
|
Exit Tank, Taken April 1
|
Taken March 28
|
Taken March 28
|
|
|
|
Pouring the Platform, March 6
|
Pouring the Platform, March 6
|
Pouring the Platform, March 6
|
|
|
|
Pouring the Platform, March 6
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
tank floors showing canals
|
Column rebar
|
|
|
|
Brick walls
|
Brick walls
|
empezando los paredes de los tanques
|
|
|
|
Columna en un esquina de los tanques
|
Haciendo los canales en el fondo de tanques de sedimentacion
|
Mezclando cemento
|
|
|
|
Levantando mas paredes
|
Levantando el pared de un lado
|
fundacion de primera solera
|
|
|
|
mas de paredes de tanque
|
Tamara construction Feb 9, 2008
|
Ing. Wil dando instrucciones del armado de hierro de tanques de floculación y sedimentación
|
|
|
|
Maestro de obra Elías y Pedro con Juan colocando el hiero de las columnas y zapata
|
|
|