Fall 2008---Photo Gallery
Tube Settlers Team Photos
|
|
|
|
|
Whole system
|
Two tanks (clay tank on top and mixture tank on bottom)
|
Side view of tube settlers
|
Turbidity Meter for the tube settlers
|
|
|
|
|
Side view of the right side of the setup
|
Side view of middle part of the setup
|
Turbidity Meter
|
Tube settlers
|
|
|
|
|
Pumps 3 and 2
|
Last part of the setup
|
Mixture tank
|
Pinch valve
|
|
|
|
|
Mixture Tank and Turbidity Meter
|
Flocculator
|
First part of the setup
|
Last part of the setup
|
|
|
|
|
First part with connections
|
Pumps at end of the setup
|
Close up view of pinch valve
|
Workshop
|
|
|
|
|
Connections from the mixture tank
|
Colette refilling clay tank
|
Source of water
|
First part of the setup
|
|
|
|
|
Control Box
|
Alum column
|
Close up view of the flocculator
|
Connections to the pumps
|
|
|
|
|
Sarah explaining the setup
|
Turbidity Meter (when it is off)
|
Tubes connecting to the mixture tank
|
Sarah and Ian
|
|
|
|
|
Stirrer for the clay tank
|
Tube settlers in the column
|
Side view of manifold
|
Sarah fixing tanks
|
|
|
|
|
Three size manifolds
|
Side view of manifold
|
Colette fileing
|
Colette thinking
|
|
|
|
|
Colette and Ian
|
Colette carefully fileing the newly cut tube
|
Colette measuring the length of the tube
|
Close up view of the tube settlers
|
|
|
|
|
mixture tank only
|
manifolds with tubes
|
Colette with long tubing
|
Holder for tube settlers with manifold
|
|
|
|
|
Clay Tank
|
|
|
|