Design Meeting Minutes
Summer 2009 Minutes
7/3/2009
Accomplishments
- Worked on midterm wiki report
- Changed baffle function so that floc tanks draw faster
Floc Hopper Group
Accomplishments
- A summary of major work completed since last meeting based on last meeting's identified outcomes/issues
-
Issues
- Difficult and unresolved issues
- Plans for action
Goals for upcoming week
Floc Tank Group
Accomplishments
- Number of baffles in the last channel is now even
Issues
- Subtracting a single baffle seems to have added more channels for smaller plant flow rates than anticipated
- The ports between the channels take up the entire height of the tank for certain flow rates
Goals for upcoming week
- Compare and understand the effect of removing a single baffle in the last channel to the original design
- Ensure that the baffle spacing is no smaller than the width of the ports
- Draw slots to slide the baffles into
Exit Channel Group
Accomplishments
- A summary of major work completed since last meeting based on last meeting's identified outcomes/issues
-
Issues
- Difficult and unresolved issues
- Plans for action
Goals for upcoming week
Materials List Group
Accomplishments
- A summary of major work completed since last meeting based on last meeting's identified outcomes/issues
-
Issues
- Difficult and unresolved issues
- Plans for action
Goals for upcoming week