Our challenges for the Fall of 2012 are designed to make it easier for new communities to adopt the AguaClara technologies. Our goals are to reduce costs, improve fabrications techniques, extend our designs to lower flow rates, improve our documentation, and create an AguaClara business to facilitate spread of the technologies.

During the fall semester we will be preparing to take a whole series of technologies to full scale deployment. We will be transferring these technologies to Agua Para el Pueblo over the coming months or during our annual January engineering in context trip to Honduras. The technologies that we are preparing to deploy include low flow unit processes for flocculation, sedimentation, and stacked rapid sand filtration. Foam filtration will soon be ready for testing in very small communities or as emergency water source. The ram pump also will be ready for testing in one of the AguaClara plants in January of 2013.

We will be developing our new theory of flocculation and we will be testing new designs for hydraulic flocculators.

We are exploring options for developing an AguaClara business to separate the implementation side from the R&D effort. AguaClara Inc. will provide engineering services to implementation partners who in turn provide support services to community owned AguaClara water treatment plants. Of course, the goal is to keep communication between all levels of the AguaClara organization so that we can continue to improve the technologies based on feedback from the field.

Teams

Team Name

PDF

Lyx Zip

Advisor

Type of Research

Specialization

Resources

Location

Comments

Students

Stacked Rapid Sand Filtration

Mickey

Design/fabrication

4540

 

B60 B

Chris

3

Demo Plant

Heidi

Design/Fabrication/Lab testing

4540/Systems

wet bench/shop

B60 A

 

3

Sedimentation Tank Hydraulics

Heidi

Lab Research

4540

PC

160

Jill

3

Fabrication

Heidi

Creation of jigs and procedures for assembling plant components

 

dry bench/shop

Project Lab

Harrison

3

Floc Sed Optimization

Mickey

Lab Research

4540

PC

B60 A L end

 

3

Linear Chemical Dose Controller

Monroe

Component selection and fabrication

hands on design

 

Project Lab

Harrison

1

Foam Filtration

Mickey

Lab Research

hands on design

PC

Project Lab

 

3

Ram Pump

Monroe

Lit Review/Design/Fabricate

3310

shop/sump pump/water tank

Project Lab

Teresa/ Christine in mid July

0

Design team challenges (Tori Klug)

The design team challenges are available in a separate google doc.

The source file for the tables is Challenges Summer 2012.xlsx.

  • No labels