- Finalized Pipe sizes, orfice sizes, flow measurement design (nonlinear) programs
- To do: Flow measurement design (linear)- contact Dave for program
- Started on plant level tank design -
- searched for height to diameter ratio of circular weir
- couldn't find anything will continue looking
- All critical plant elevations need to add chlorine tank and chlorine float valve
- Sedimentation inlet pipe
- needs air release, two options:
- drill small hole in pipe
- slope pipe
- need to document
- Need to clean programs up-check to make sure same equation is never written twice, if so add to fluid functions
Overview
Content Tools