• Finalized Pipe sizes, orfice sizes, flow measurement design (nonlinear) programs
  • To do: Flow measurement design (linear)- contact Dave for program
  • Started on plant level tank design -
    • searched for height to diameter ratio of circular weir
    •  couldn't find anything will continue looking
  • All critical plant elevations need to add chlorine tank and chlorine float valve
  • Sedimentation inlet pipe
    • needs air release, two options:
    • drill small hole in pipe
    • slope pipe
    • need to document
  • Need to clean programs up-check to make sure same equation is never written twice, if so add to fluid functions
  • No labels