Contributions to date:
- Helped begin pipe database, completed pipe fittings database
- Created functions in pipe database to output pipe dimensions based on a given inner pipe radius
- All scripts were rewritten to decrease the number of inputs required by using the above mentioned pipe functions
- Solved resolution problem by rewriting scripts for basic plant components (i.e elbow, tank, pipe etc.)
- Worked on incorporating units into the program algorithms, now completed
- Fixed alignment problems in grit chamber
- Worked on making grit chamber and level tank scripts easier for users, other than myself to read
- Worked on creating algorithm for floc tank with baffles
- Started working with Integration team leader to update inputs file and start linking it with the master program
{"serverDuration": 58, "requestCorrelationId": "3b747c558300dc05"}