"Plate Settler Spacing Team" Meeting Minutes
Spring 2009 Minutes
"04/10/09"
Accomplishments
- Completed tests for the 3/8 in ID tube at high and low floc blankets
- Ordered and recieve all of our tube sizes, in the process of cutting them to the correct size
- Order connector for the various tubes sizes
Metrics
- Analyzed results for 1/4 in and 3/8 in tubes
- Determined the length needed to test tubes at various L/D ratios
Outcomes
- We see failure at high floc blanket and high VCs
- We made some quality visual observations for how the tubes clog
Issues
- We may have to glue the connectors onto the tubes, which would mean we may have to buy new connectors for the second experiment with longer tubes.
- We are not sure how to format the old wiki information