"Plate Settler Spacing Team" Meeting Minutes

Spring 2009 Minutes

"04/10/09"

Accomplishments
  • Completed tests for the 3/8 in ID tube at high and low floc blankets
  • Ordered and recieve all of our tube sizes, in the process of cutting them to the correct size
  • Order connector for the various tubes sizes
Metrics
  • Analyzed results for 1/4 in and 3/8 in tubes
  • Determined the length needed to test tubes at various L/D ratios
Outcomes
  • We see failure at high floc blanket and high VCs
  • We made some quality visual observations for how the tubes clog
Issues
  • We may have to glue the connectors onto the tubes, which would mean we may have to buy new connectors for the second experiment with longer tubes.
  • We are not sure how to format the old wiki information

Any Overall Team Comments:

  • No labels