Tamara Design
The Tamara Plant was completed in June of 2008. Since its inauguration, the AguaClara team has been able to evaluate the plant design and improve upon it. It should be noted that since the project was completed before the implementation of our current documentation process, specific details were difficult to find.
Design Specifics
The dimensions of the plant could not be found, however many changes were made to future designs based on the operation and maintenance of the Ojojona Plant. These improvements can be found on the Project Sites' Tamara page.
Other information can be found on the Tamara Project Sites page.
Plant Drawings
The following drawing was taken from Ing. Wil Serrano's structural drawings.
Planta_Tamara_07-febrero-08.dwg