Challenges for Spring 2009 Pilot Plant Team

Number of team members needed: 3

Important team member skills:

  • Familiarity with Aguaclara Project
  • CEE 4540

Challenges

Floc Tank

  • Team members should test consecutive alum doses in order to familiarize themselves with the tank and floc formation
  • Compare uniform and non-uniform baffle configuration results from the flocculation tank with high incoming turbidity

Tube Flocculator

  • Alter the tube flocculat set-up to minimize air trapped from joints and it has a more permanent location at the plant.
  • Set up FReTA to be used with the tube flocculator
  • Use FReTA to compare settling velocities at different points in the tube flocculator
  • Compare raw water readings from the Pilot Plant FReTA with the laboratory results