You are viewing an old version of this page. View the current version.

Compare with Current View Page History

Version 1 Next »

Challenges for Spring 2009

Number of team members needed: 3

Important team member skills:

  • Familiarity with Aguaclara Project
  • CEE 4540

Challenges

  • Team members should test consecutive alum doses in order to familiarize themselves with the tank and floc formation
  • When performing tests with the flocculation tank, make sure there is a high incoming turbidity
  • Compare uniform and non-uniform baffle configuration results from the flocculation tank
  • Design a better configuration for the tube flocculator
  • Set up FReTA to be used with the tube flocculator
  • Use FReTA to compare settling velocities at different points in the tube flocculator
  • Compare raw water readings from the Pilot Plant FReTA with the laboratory results
  • No labels