You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 97 Next »

Pilot Plant

Overview

The pilot plant project started when the spring 2007 Aguaclara team built a vertical flow hydraulic flocculator at the Cornell University Water Treatment Plant (CUWFP). The vertical flow hydraulic flocculator was built as a small scale version of those in Honduras. The vertical flow hydraulic flocculator has been used to test the effects of tapered flocculation on floc formation. The project has evolved since the first flocculator was built. There are two sed tanks at the CUWFP, currently being used to test the combination of sludge blankets and lamella to optimize settling. A tube flocculator has also been constructed to examine the behavior of raw water during flocculation.

The Automated Flow Control Team is a related team.

Research Groups

Flocculation
Sedimentation

Additional Information

New Members
New to the Pilot Plant? These pages may help you become more familiar with commonly-used terms and with the pilot plant.

Resources

  • No labels