9/15/08-9/21/08

Accomplishments

  • Julia and Kellie finished caulking the pipes.
  • Team reviewed wiki pages.
  • Team met at pilot plant on 09/18/08.
  • Julia discussed with Sarah the configuration of the tube flocculator and the alum does needed to form a floc blanket over time.
  • Team goals for the semester were updated.

Outcomes

  • Could not fully start up the plant because some of the caulk is not dry.
  • Much of the sludge build-up was pumped out of the tank.
  • Work on the wiki page was discussed and divided up among the sub-teams. Christine will work on the Tube Flocculator pages, while Kellie and Shaina rearrange different parts of the Sedimentation Tank page.

Metrics

  • N/A

Issues

  • Our method for pumping sludge out of the tank is unnecessarily time-consuming. We will try to find a different way.
  • Since we could not start up the plant, Shaina will return on 09/19/08 to check the caulk and begin the running the plant with a 20 mg/L alum dose if the caulk is dry. We need to run the plant consistently at this concentration for some time before we can form a floc blanket.

9/8/08-9/14/08

Accomplishments

  • Kellie and Julia went to pilot plant on 9/6/08 for training with Sara.
  • Sara, Kellie, Julia and Shaina started plant on 9/10/08. Sarah introduced the team to process controller.
  • Team met 9/10/08 and created Fall 2008 task list.
  • Team went to the pilot plant to caulk leaky pipe, restring tube flocculator, and secure pipes connecting the lamella.

Outcomes

  • The seal between the flocculator and sed tank is ineffective. The plant was turned off so that leaky pipe connecting the flocculator to the sed tank can be caulked.
  • caps for pipes were the wrong size
  • flocculator was restrung.

Metrics

  • N/A

Issues

  • If possible a new configuration for tube flocculator will be hung that does not pinch tube.
  • need to finish caulking pipe.
  • need correct caps to secure lamella
  • Next week Shaina and Kellie will work on forming a sludge blanket in the sed tanks once the tube is caulked. Julia and Christine will work on measuring turbidity in the tube flocculator.