You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 4 Next »

So if you are a new students in Tube Floc team, here are some basics that you need to know.

Checklist for the setup

  • Make sure all connection is tight.
  • Make sure that there is no clogging in the floc and pump tubes
  • Check the tube size (both pump and floc) and the pump panel setup
  • The data connectors are easily unplugged, so check them out!

 

Amount of water

Amount stock added

Stock concentration

 

Liter

gram

g/L

Clay

11

22.2

2.02

Alum

11

16.5

1.5

Humic acid

 

0.375

3.5 mg/L

Process Controller

  • No labels