You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 3 Next »

So if you are a new students in Tube Floc team, here are some basics that you need to know.

Checklist for the setup

  • Make sure all connection is tight.
  • Make sure that there is no clogging in the floc and pump tubes
  • Check the tube size (both pump and floc) and the pump panel setup
  • The data connectors are easily unplugged, so check them out!

 

Amount of water

Amount stock added

Stock concentration

Clay

11L

22.2 g

2.02 g/L

Alum

11L

16.5 g

1.5 g/L

Humic acid

 

0.375 g

 

Process Controller

  • No labels