You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 2 Next »

So if you are a new students in Tube Floc team, here are some basics that you need to know.

Checklist for the setup

  • Make sure all connection is tight.
  • Make sure that there is no clogging in the floc and pump tubes
  • Check the tube size (both pump and floc) and the pump panel setup
  • The data connectors are easily unplugged, so check them out!

Stock Concentration

Clay (11L)

22.2 g

Alum (11L)

16.5 g

Humic acid

0.375 g

Process Controller

  • No labels