Prefabrication 1L/s (Prefab)

The goal of the Prefabrication 1 L/s team is to research, test, and determine fabrication methods for the full-scale plant production in Honduras. We also continue to design novel geometries for low-flow sedimentation tanks and flocculators, and refine the integration of the dosing, flocculation, sedimentation, and filtration processes in these smaller plants.
Spring 2016

This semester, we successfully designed and fabricated a 1/9 scale model of the sedimentation tank. We showed that a large, plastic corrugated pipe was a potential low-weight, low-cost solution to traditional concrete tanks and determined that plastic welding was a viable fabrication method for tank construction in Honduras. We also succeeded in testing our sedimentation tank using a pre-existing tube flocculator in the lab and cleaned 50 NTU water to meet WHO standards.

 

Members

Felix Yang:  fyy2@cornell.edu

Meryl Kruskopf : mjk347@cornell.edu    

Kimberly Buhl : knb39@cornell.edu  

Claire DeVoe : cmd288@cornell.edu 


Documents

 

Challenges

Tasks

Symposium

Final Presentation

Final Report

Additional Documents
Spring '16 

 

 

  • No labels