You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 20 Next »

Spring 2011 Challenges

The following documents are copied from Fall 2010 and are thus only drafts. The goal is to edit this before the spring semester begins! All edits should be made to the attached word documents. Do NOT create files with new names. Instead simply replace the existing file with the revised file.
Design (15) in Accel
Sedimentation (4) in B60
Tube Floc (4) in B60
Stacked Filtration (6) in B63 along window: two team members as joint members of Design team
Foam Filtration (4) in B63 on right end of bench top
Plate Settle Spacing (4) in B60
Chemical Dose Controller (6) in B60: two team members as joint members of Design team
Environmental and Water Resources Systems
Outreach (6-8)
(estimated number of students per team)
New Challenges

Loading

Team organization survey

Loading

Loading

Loading

Loading

Loading

Loading

Loading

Loading

  • No labels