You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 13 Next »

Spring 2011 Challenges

Design (15) in Accel
Inlet Manifold (4) in B60
Tube Floc (4) in B60
Stacked Filtration (6) in B63 along window: two team members as joint members of Design team
Foam Filtration (4) in B63 on left end of bench top
Plate Settle Spacing (4) in B60
Chemical Dose Controller (6) in B60: two team members as joint members of Design team
Outreach (3-5)
(estimated number of students per team)

Team organization survey

Loading

Loading

Loading

Loading

Loading

Loading

Loading

Loading

  • No labels