You are viewing an old version of this page. View the current version.

Compare with Current View Page History

Version 1 Next »

Jeff Will's Individual Contribution Page

"Semester" Contributions

Paragraph (really, just one please (smile) ) explaining contributions to date. Provide links to pages you worked on. Ex. "I re-wrote the main chemical doser page so that it is up-to-date to reflect the new research we are conducting."

Pages Created

Content created by Anonymous
There are no pages at the moment.

  To determine the port drain size, I needed to determine how long it
takes for water to flow through successive ports and how the level
changes in successive tanks.

In addition to the AutoCAD coding for the vertical
flocculator ports, I helped to make the code more efficient for the floctank drawing program.  Because the code was
simpler for other parts of the tank and I wanted to attempt to subtract
multiple objects from multiple other object simultaneously, I used the
code from other parts of the flocculator to test how this could be done.
 
 

  • No labels