Challenges for Summer 2009

Subteam Leader: Steve Mitchell

Number of team members needed: 3

Important team member skills:

  • computer programming

Challenges

  • Work with the team Honduras to evaluate the current linear CDCs at the Tamara and Cuatro Comunidades.
  • Need to make the non linear mathCAd file more robust.
    • Incorporate how long tubing will need to be.
  • Figure out how the non linear CDC will fit into the overall plant design.
    • Consider connecting two different tubing sizes to accommodate for the distance the flow control module and the stock tank.
  • Extend the design to work for a large flow rate range.
  • Run experiments to evaluate the materials being used i.e. flexibility of the tubing.
  • Test the flow ranges with varying tube lengths.