Pilot Plant Meeting Minutes

Spring 2009 Minutes

April 10, 2009

Working Group: 1

Accomplishments
  • Set Process Controller to dose for PAC
  • Set pump to turbidimeters to produce a tube settler capture velocity of 10 m/day
  • Began dosing PAC!
  • Obtained data to form turbidity profile for baffle spacing of .152 m at 100 L/min.
Metrics
  • Quantitative and qualitative results from accomplishments and outcomes.
  • Potential metrics for unresolved issues.
Outcomes
  • Plant is ready for testing different configurations with PAC as coagulant
Issues
  • Want to dilute PAC so peristaltic pump isn't pumping at non-optimal (low rpm) rates.

Working Group: 2

Accomplishments
  • A summary of major work completed since last meeting based on last meeting's identified outcomes/issues
Metrics
  • Quantitative and qualitative results from accomplishments and outcomes.
  • Potential metrics for unresolved issues.
Outcomes
  • A summary of resolutions based on what was accomplished.
  • New directions and ideas that result from these resolutions.
Issues
  • Difficult and unresolved issues
  • Plans for action

Any Overall Team Comments:

  • No labels