Pilot Plant Meeting Minutes

Spring 2009 Minutes

March 27, 2009

Working Group: 1

Accomplishments
  • Caulked holes from previous baffle layouts for 32 baffles to allow for reuse on secondary baffle system setup
  • Drilled holes and cut baffles according to Adjustable Baffle System design
  • Cut Pex tubing as spacers for secondary baffle system
  • Assembled secondary baffle system
Outcomes
  • Completed secondary baffle system to allow for one system to be adjusted while another system is in the tank being tested

Working Group: 2

Accomplishments
  • Calculated range of energy dissipation rates for various non-tapered baffle spacings (b)
Metrics

ε = (K.baffle*Q^3) / (2*b^4*w^3)

Q = 100 L/min
K.baffle = 4
Π.cell = 1
w = 12 in
b = various spacings (in)

b (in)

ε (mW/kg)

2"

49.099

3"

9.699

4"

3.069

5"

1.257

6"

0.606

7"

0.327

8"

0.192

Outcomes
  • Have range of values of spacings to be tested with adjustable baffle system to find an optimal energy dissipation rate. With both sets of baffles done and a range of dissipation rates to test we can turn on the plant and begin taking turbidity profiles.

Working Group 3

Accomplishments

*Begun addressing issues of organization from midterm wiki feedback
*Begun overall reorganization/recombination of redundant pages

Outcomes

*Pilot Plant wiki space is gradually becoming more organized