Sludge Drain Design Program

This program designs the pipe that will be used for the sedimentation tank sludge drainage. The sludge drain runs along the bottom of the each sedimentation tank and collects the flocs as they fall from the lamella and slopes.

Sludge Drain Design Algorithm

Sludge Drain Inputs
Sludge Drain Outputs
Sludge Drain AutoCAD Drawing Program

Algorithm

The number of sludge drains is determined by the number of sloped pairs in the sedimentation tanks. This is defined as N.SedSludge, and uses the number of slope pairs calculated in the Sedimentation Inlet Slopes program.

Next, the number of orifices in the pipe can be calculated given the orifice spacing from the Design Assumptions, and the given length of the sedimentation tank from the [Sedimentation] program.

Unable to find DVI conversion log file.

The diameter of the sludge drain pipe is estimated through an iterative process, using the ND.Manifold equation found in the Fluids Functions program.

Unable to find DVI conversion log file.

Because the sludge drain is no longer a pipe but now a rectangular channel, this nominal diameter is then used to calculate the required cross-sectional area of the drain. Based on manifold theory, the total area of the sludge orifices is equal to the cross sectional area of the manifold.

Unable to find DVI conversion log file.

Given the required area for uniform flow, and the depth of the drain, H.SedSludge (set to be 5 cm in Design Assumptions), the width of the drain is calculated.

Unknown macro: {latex}

\large
$$
W_

Unknown macro: {SedSludge}

= {{TotalArea_

Unknown macro: {SludgeOrifices}

} \over {H_

}}
$$

Once the total area of the orifices and the number of orifices have been calculated the diameter of each orifice is found by rounding the required diameter up to the next available drill diameter.
The initial flow rate through the sludge drain is calculated using values found in the [Sedimentation program], and the drainage time for the sedimentation found in the Design Assumptions program.

Unable to find DVI conversion log file.