You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 7 Next »

Floating Floc Meeting Minutes

Spring 2009 Minutes

March 6, 2009

Working Group: Bubbles

Accomplishments
  •  
Metrics
  •  
Outcomes
  •  
Issues
  •  

Working Group: Sand Filter

Accomplishments
  • Acquired concrete data on the performance of the device
  • Began altering sand depths in column and observing the effects on bubble formation
Metrics
  • At 200mL/min, the column reaches its optimum extraction of air after 20 minutes
  • Ran tests at different flow rates for ten minute intervals; found that the higher the flow rate, the more bubble extraction there was, which means that more dissolved oxygen was extracted
Outcomes
  •  
Issues
  • Obtaining and installing a new DO probe
  • Redesigning setup to improve quality of data; installing a pressure probe on top of the bubble chamber and finding a method to automatically remove air from the bubble chamber between runs

Any Overall Team Comments:

  • No labels