Floating Floc Meeting Minutes
Spring 2009 Minutes
February 27, 2009
Working Group: Bubbles
Accomplishments
- Collected data
- Solved DO probe bubble problem
- Posted summaries of articles
- Wrote Meeting Minutes
Metrics
- Moved the DO probe so we no longer have bubble formation issues
- Ran experiments
Outcomes
- Another improvement to the system
Issues
- Redo AutoCAD drawing of system
- Plans for action
- Doubt about accuracy of DO probe
Working Group: Sand Filter
Accomplishments
- Ran four tests: without sand, sand at 50mL/min, sand at 100mL/min, and sand at 200mL/min
- Add more references in the annotated bibliography
Metrics
- Analyze the collected data with Excel.
- Overall, the data show that the inflow DO is lower than the outflow DO.
- The present of the sand filter does not reveal dramatic differences between the filter with and without the sand.
Outcomes
- Final drawing of the experimental setup is done.
Issues
- DO read that the initial DO is lower than the outflow DO
- When the setup starts to run, the inflow DO is too low (as low as 4 mg/L). Despite the recalibration of both DO probe, the DO reading still remain incorrect.
- The flow rate of the setup is not consistent.