You are viewing an old version of this page. View the current version.
Compare with Current
View Page History
« Previous
Version 2
Next »
Automated Plant Inflow System Meeting Minutes
Spring 2009 Minutes
February 20, 2009
Working Group: Linear Automated Plant Inflow System
- Henry Zeng
- Steven Mitchell
Accomplishments
- Set up the Linear Automated Plant Inflow System.
- Consulted Nicole Ceci to determine what parts were required to set up the Linear Automated Plant Inflow System.
- Worked on MathCad file to determined whether the pipe is sized too small to accommodate the flow rates for which the orifice pattern will deliver in the LFOM.
- Helped to determine if the LFOM will fail for all flow rates.
- Created initial outline for paper.
- Edited goals and deadlines.
- Divided into two working groups.
- Researched various references for research and the paper.
Outcomes
- Scheduled a meeting with Monroe to determine how to configure and install the pressure sensor.
- Consolidated all the MathCad files into one document.
- Installed the Linear APIS in the AguaClara Lab.
- Scheduled a meeting with Monroe to review basics of the paper.
- Determined that the Linear APIS was not missing any components.
- Reviewed initial draft of paper.
Working Group: 2
Accomplishments
- A summary of major work completed since last meeting based on last meeting's identified outcomes/issues
-
Metrics
- Quantitative and qualitative results from accomplishments and outcomes.
- Potential metrics for unresolved issues.
Outcomes
- A summary of resolutions based on what was accomplished.
- New directions and ideas that result from these resolutions.
Issues
- Difficult and unresolved issues
- Plans for action