Erin Loughlin's Individual Contribution Page
Spring 2014 Semester Contributions
I am working on updating the current Demo Plant to overcome existing failure modes. The main tasks for the semester are eliminating the flocculator overflow; increasing the capacity of stock tanks to achieve a continuous run time between 30-60 minutes; and updating the plant frame for ease-of-use during set-up and break-down.