Spring 2011 Challenges
Design (15) in Accel
Inlet Manifold (4) in B60
Tube Floc (4) in B60
Stacked Filtration (6) in B63 along window: two team members as joint members of Design team
Foam Filtration (4) in B63 on left end of bench top
Plate Settle Spacing (4) in B60
Chemical Dose Controller (6) in B60: two team members as joint members of Design team
Outreach (3-5)
(estimated number of students per team)
Team organization survey
{"":"Challenges Design Spring 2011.doc","0":"Challenges Design Spring 2011.doc","type":"doc","pageID":"134219730"}
{"":"Challenges Sedimentation Spring 2011.doc","0":"Challenges Sedimentation Spring 2011.doc","type":"doc","pageID":"134219745"}
{"":"Challenges Tube Floc Spring 2011.doc","0":"Challenges Tube Floc Spring 2011.doc","type":"doc","pageID":"134219756"}
{"":"Challenges Stacked Filtration Spring 2011.doc","0":"Challenges Stacked Filtration Spring 2011.doc","type":"doc","pageID":"134219759"}
{"":"Challenges Foam Filtration Spring 2011.doc","0":"Challenges Foam Filtration Spring 2011.doc","type":"doc","pageID":"134219765"}
{"":"Challenges Plate Settler Spacing Spring 2011.doc","0":"Challenges Plate Settler Spacing Spring 2011.doc","type":"doc","pageID":"134219772"}
{"":"Challenges Chemical Dose Controller Spring 2011.doc","0":"Challenges Chemical Dose Controller Spring 2011.doc","type":"doc","pageID":"134219776"}
{"":"Challenges Outreach Spring 2011.doc","0":"Challenges Outreach Spring 2011.doc","type":"doc","pageID":"134219783"}