Design Meeting Minutes

Summer 2009 Minutes

7/17/2009

Accomplishments
  •  
  •  

Floc Hopper Group

  •  
Accomplishments
  •  
Issues
  •  
Goals for upcoming week
  •  

Floc Tank Group

Accomplishments
  • Discovered that ports are not in fact taking up the whole height of the floc tank, but rather are drawing in the negative direction
Issues
  • Baffle spacing is currently too small and must be changed so as to ensure the width and height calculations of the ports come out to be positive
Goals for upcoming week
  • Ensure that a minimum baffle spacing is achieved
  • Draw slots for the baffles

Materials List Group

Accomplishments
  •  
Issues
  •  
Goals for upcoming week
  •  