Spring 2011This wiki page is mainly for internal PSS communication. For more information about the Plate Settler Spacing team team, go to the Structure Team page.
View File |
---|
Detailed Task List• Determine moment in column at incipient cracking in the tension face and set this moment as our maximum allowable moment • Transpose our column design calculations to a MathCAD file from Excel • Convert calculations and tables to the metric system • Write a MathCAD file that will produce column sizing and spacing given key inputs such as the dimensions of the tank and height of the water; this will include rebar size and amount of rebar used |