Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Panel

Problem Specification
1. Pre-Analysis and Start-up
2. Geometry
3. Mesh
4. Setup (Physics)
5. Solution
6. Results
7. Verification and Validation

Note
Title"Under Construction"

Step 3: Mesh


Step 3: Mesh

In this section the geometry will be meshed with 500 elements. That is, the pipe will be divided into 100 elements in the axial direction and 5 elements in the radial direction.

...