7/17/2009

Accomplishments
  •  
  •  

Horizontal Flow Group

Accomplishments
  • Reviewed current code for flocculator
  • Noted any values that would potentially need to be changed to allow horizontal flow
Issues
  • What inhibits the design from just being an 'if' statement that for the most part rotates the tank 90 degrees?
Goals for Upcoming Week
  • Meet with Monroe to discuss ideas and more theory behind switch

Floc Hopper Group

  •  
Accomplishments
  •  
Issues
  •  
Goals for upcoming week
  •  

Floc Tank Group

Accomplishments
  • Discovered that ports are not in fact taking up the whole height of the floc tank, but rather are drawing in the negative direction
Issues
  • Baffle spacing is currently too small and must be changed so as to ensure the width and height calculations of the ports come out to be positive

...

  • Ensure that a minimum baffle spacing is achieved
  • Draw slots for the baffles

Materials List Group

Accomplishments
  •  
Issues
  •  
Goals for upcoming week
  •