Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  • Quantitative and qualitative results from accomplishments and outcomes.
  • Potential metrics for unresolved issues.
Outcomes
  • A summary of resolutions based on what was accomplished.
  • New directions and ideas that result from these resolutions.
Issues
  • Decided that ports between channels will be located at the top of the wall instead of the bottom
  • Sludge drain dimensions will be constrained so that they must be able to cover a 3-4" pipe
Issues
  • Chemical stock tanks need to be changed so that a volume and dimensions are given. This will give engineers the option of using barrels or building tanks.
  • In order to determine baffle thickness the baffle area needs to be included
  • Difficult and unresolved issues
  • Plans for action

Any Overall Team Comments:

...