Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Migration of unmigrated content due to installation of a new plugin

...

Other work this semester has been updating the MathCAD Files to reflect changes in the design. I specifically worked on updating the Sludge Drain file to accommodate a rectangular sludge drain channel rather than the PVC pipe that was used previously. This also required updating the Sedimentation Program because the new design changes the thickness of the plate that covers the sludge drain and hence the vertical layout of the sedimentation tanks. I also updated the algorithms on the wiki for both the Sludge Drain and the Inlet Channel so that they accurately describe the algorithms used in design.

...