...
- Installed a second set of baffles in the plant.
- Took apart old baffles to construct more baffles with the updated design.
- Calibrated and cleaned the turbidimeters and changed the trubidimeter tubings.
- Changed pump and tube settler tubes
- Cleaned the flocculation tank.
- Created notes on the Aguaclara wiki on how to turbidimeter maintenance and calibration.
- Prepared flocculation tank for future tests.
...