Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Migrated to Confluence 4.0

...

  • Installed a second set of baffles in the plant.
  • Took apart old baffles to construct more baffles with the updated design.
  • Calibrated and cleaned the turbidimeters and changed the trubidimeter tubings.
  • Changed pump and tube settler tubes
  • Cleaned the flocculation tank.
  • Created notes on the Aguaclara wiki on how to turbidimeter maintenance and calibration.
  • Prepared flocculation tank for future tests.

...